## 1.02 SUBMITTALS
### A.
Informational Submittals: Submit the following:
1. Pre-use elevator inspection report(s): detailing pre-use condition of Owner’s elevator(s) proposed for use by Contractor.
2. Post-use elevator inspection report(s): detailing any recommended repair or rehabilitation work needed to return elevator to pre-use condition.
3. Required notices to owner’s and authorities of adjacent properties when needing to obstruct access or interrupt utilities.